3/15/2022

Tunnel And Slot Preparation

  1. Tunnel And Slot Preparation Tips
  2. Tunnel And Slot Preparation Software
  3. Tunnel And Slot Preparation Machine
  4. Tunnel And Slot Preparation Tool
First Shafts in Cadia East Underground Project/Australia

A large number of vertical or inclined small-diameter slot holes need to be excavated in many underground mines worldwide. To this aim, Herrenknecht has developed and built a new Boxhole Boring Machine (BBM) (Fig. 1). Its concept is based on the well-proven Microtunnelling pipe jacking technology – an area in which the company can look back on 25 years of experience in international projects.

Verify that the graft is inserted into the base of the bone tunnel by reading the lasermark measurements on the Tendon Fork.! Position the Implant Sheath in the tunnel so that it is posterior to the graft, which exits the bone tunnel anteriorly, and the compressed profile is adjacent to the graft. Remove the Tendon Fork. Tunnel preparation and restoration with a glass ionomer cement is possible due to the chemical adhesion of the cement, which will strengthen the weakened proximal enamel wall and marginal ridge The transference of fluoride ions offers caries protection to the adjacent tooth surfaces.

1 Introduction

With this new BBM technology the target is a higher safety standard and minimal drift dimension. Higher production rates can be achieved using the Herrenknecht BBM resulting in significant time savings in producing slot holes compared to conventional drill and blast excavations. The faster and more safely slot holes can be constructed, the earlier the actual production in the mine can start or be continued.

Today, the BBM is primarily deployed in gold, copper and other ore mines usually prepared in accordance with the block caving method, whereby the BBM largely contributes toward preparing the draw points (ore extraction points) during the production process. Other applications include drilling ventilation shafts or preparing ore passes for transporting ore between the production level and the haulage level.

Initial results of the BBM indicate that the machine is capable of achieving high and consistent production rates and guarantees high mobility and flexibility compared to other methods.

2 The BBM concept

The Boxhole Boring Machine was developed for fast and safe construction of vertical and inclined slot holes (±30° from vertical) with a diameter of up to 1.5 m and a length of max. 60 m in hard rock formations. During development, the design was focused mainly on increased safety due to a remote operated machine, higher productivity and optimum machine mobility. Quick relocation of the BBM and minimum space requirements were also key factors of the design.

For transporting the BBM between different locations in the underground, a compact crawler unit provides fast transport and a high degree of flexibility in confined underground conditions. A modular design allows operation even in tight spatial conditions. The jacking frame with the boring unit, cable drum and power pack can be positioned separately.

The boring unit is positioned in the jacking frame during the transport. In the production area, the jacking frame is adjusted to its correct position and aligned toward the requisite boring angle. To stabilize the system and transfer the operational thrust and torque loads into the rock, the jacking frame is braced against the floor and the back (Fig. 2). Complex foundations can therefore be dispensed with as well as other preparatory excavation work on the back. The thrust forces are transferred from the jacking frame to the machine cutterhead via steel thrust pipes similar to a conventional horizontal pipe jacking operation. The cutterhead is designed for hard rock geologies of 180 MPa and more and fitted with multiple-row carbide cutters. Different cutterhead variants equipped with various cutter tools, e.g. single-disc cutters can also be used as an alternative.

A funnel on the boring machine below the cutterhead directs the excavated cuttings through the boring machine and the thrust pipes to the material chute on the jacking frame where they slide by gravity into a skip for transporting. Depending on the mine requirements, adapted solutions for further muck handling are also conceivable here.

After each meter of exaction, the operation process will be stopped temporarily and a clamping system holds the pipe string and the boring machine in place in order to install and connect the next thrust pipe. A wheel loader is used for installation. A breakout unit allows the thrust pipes to rotate ± 10° if the pipe string is blocked. This mechanism is integrated in the jacking frame.

Once the required boring depth has been reached, the boring unit is retracted. The thrust pipes are removed one by one from the bottom of the pipe string until the boring unit is completely pulled back through the drilled hole and is back in the jacking frame. After that, the BBM can be transported to the next site.

The Boxhole Boring Machine is fully remote-controlled. The crawler for relocating the BBM is also remote-controlled. The operator remains in a safe working area while the machine or crawler is in operation as well as during boring and transport.

3 Field test in the Black Forest

Slot

After assembly of the BBM1100 prototype in early 2011, it was tested under real conditions. The „Clara Mine“, a small mine site in the Black Forest close to the Herrenknecht factory (southern Germany) owned by Sachtleben Bergbau GmbH & Co. KG, presented optimum conditions for a field test. Over a period of 4 weeks, a number of detailed test slot holes were successfully drilled (Fig. 3).

Vertical and inclined test slot holes with a diameter of 1.1 m and a length of 9 m were successfully drilled and production rates of 9.0 m within 5 hours could be achieved in challenging rock conditions with a UCS of up to 250 MPa (Fig. 4). Instantaneous advance rates of 80 to 100 mm/min were achieved. During the test period, valuable data was collected in order to optimize operational parameters and handling details under real site conditions.

4 BBM goes Down Under – Application in the Cadia East Underground Project

After the successful test phase, the BBM was shipped to its destination – the “Cadia East Underground Mine” in New South Wales, 260 km west of Sydney, Australia. East of the Cadia East Underground Mine, gold and copper is produced in the open-pit mine at Cadia Hill. Extensive soil analyses have established additional ore deposits. Newcrest Mining Limited, a leading developer and operator of gold and copper mines, excavates these ore deposits at Cadia and started to excavate the raw material reserves at Cadia East in 2005. Ore deposits cover an area approx. 2.5 km in length, 600 m wide and up to 1.9 km deep. These ore reserves are estimated as harboring approx. 19 million ounces of gold and 3 million t of copper making Cadia East the largest underground mine in Australia and the deepest block caving underground mine in the world with a life time of around 30 years.

Preparations are fully underway for excavating the ore deposits with production scheduled to commence in 2013. The BBM is currently deployed at the production level for developing the draw points making it a key component in development of the mine.

Mancala Pty Ltd., a privately-owned group of companies providing specialized design, engineering, construction and excavation services for the Australian mining and construction industry, ordered a Herrenknecht BBM1100 in October 2010. After transportation and commissioning in Australia in September 2011, the BBM was transported to Cadia East. During the test run and commissioning at a depth of approx. 700 m, 3 vertical test operations with a length of approx. 18 m were successfully bored in fractured and blocky rock formations with a UCS of up to 200 MPa (Fig. 5).

The BBM1100 has been in operation at a depth of approx. 1000 m at the Cadia East production level since November 2011 where it plays a major role in constructing draw points for the subsequent production process.

To date, more than 40 slot holes (as at June 2012) have been produced with an average length of 16.5 m and an average advance rate of 1.5 m/h. The operator has succeeded in realizing up to 3 slot holes a week in single-shift operation (incl. setup, boring and transport preparation) thereby offering the mine operator and contractor security in terms of further planning.

5 Conclusion and outlook

The Boxhole Boring Machine (BBM1100) has been successfully used under real site conditions in the Cadia East Underground Project in Australia. To date more than 40 slot holes have been drilled with a high performance level.

The BBM technology offered by Herrenknecht represents an alternative concept for mines, planners and contractors to previous methods of producing slot holes of various diameters and lengths. BBM technology can be individually adapted to the respective mine requirements making it suitable for use in practically any mine.

Thanks to the positive results associated with increased work safety, mobility and independence of the plant, advance rate achieved in mining operations, service and ongoing development and improvement of the product during its initial operation in Australia, 3 further Boxhole Boring Machines are under manufacturing. These involve 2 identical BBM1100 machines for deployment in mines in Australia and a further development of the BBM1500 (steerable) model for the Chilean market where the BBM1500 will be used for producing slot holes with a length of 60 m and a diameter of 1,500 mm for various applications.

Acknowledgments

The authors would like to acknowledge the great support provided by the team of the Sachtleben Bergbau GmbH & Co. KG Clara Mine during the prototype testing period.

article as pdf

tunnel 05/2012

Open to the Public
12415 Wayzata Blvd, Suite 15
Minnetonka, Minnesota55305USA - Map
Mon - Fri: 11am to 9pm
Sat: 8am to 10pm
Sun: 8am to 9pm
12ft (3.7m) Recirculating
SkyVenture Wind Tunnel

iFLY World brings indoor skydiving to Minneapolis and the surrounding Midwest region. The tunnel is the first of it's kind 12ft dual recirculating model. The facility hosts first time flyers, proflyers, and skydivers in the 5,000 square foot facility across the street from the Ridgedale Center in Minnetonka, MN. The facility officially opened in late December 2018.

Gear & Training
You will be provided with all the equipment you need. This includes a jumpsuit, helmet, goggles and earplugs. Check out our Gear Guide if you're interested in taking your own equipment with you.

Facility Offerings

  • Group/Event Hosting
  • Party Rooms
  • Conference Facilities
  • Catering Available
  • Educational Programs

What is Indoor Skydiving Video

Age Limit
Flyers must be at least 3 years old.

Weight Limit
Flyers must be less than 300 lbs.
Flyers over 260 lbs must contact the facility before flying.

You should not fly if you are pregnant or have previous shoulder dislocations.

More Questions About Flying?
Please read our FAQs.

The Experience
The entire first time flight experiences take roughly 1-2 hours. After arriving and checking in, you take part in a personalized training session before gearing up to fly. During your flights your instructor teaches you to fly your body. You take turns flying one at a time with other first time flyers.

Pricing

First Time Flyers
2 Flights: $69.95
2 Flights + Virtual Reality: $109.95
3 Flights: $89.95
4 Flights: $111.95
5 Flights: $131.95

For first time flights we recommend between 2 and 6 minutes of flight time per person. This gives you enough time to understand the basics of flying your body and is plenty of time for a great experience. For more pricing information, read our pricing article.

Tunnel And Slot Preparation

Instructor Rating System
International Bodyflight Association

Manufacturer
SkyVenture

Tunnel Type
Recirculating

Open Since:
Dec, 2018

Flight Chamber Style
Round Wall-to-Wall

Flight Chamber Diameter
12ft (3.7m)

Flight Chamber Height
N/A

Top Wind Speed
N/A

Nearby Airports

Minneapolis−Saint Paul International Airport (MSP)

Hotel Options Nearby

Car Hire

We recommend using rentalcars.com to compare rates and find the best deal for your car hire.

No Other Tunnels Found within a 150 Mile Radius of this Location
Browse all Tunnels in Minnesota or in the USA
Sign up now to be notified of any updates, events, deals for this tunnel.
New Flyer Section
Frequently Asked Questions
The Beginners Guide to Indoor Skydiving
Who Can Fly in a Wind Tunnel?
No News Updates or Articles for this location.
No Upcoming Camps, Competitions or Other Events
If you know of an upcoming event at this or any location, please submit it through our event submission form

Tunnel And Slot Preparation Tips


No photos have been submitted for this location yet.
Submit a Photo
Average rating of 5 from 6 review(s).
JOSH WAS AMAZING
Nickname: Karla
Review Date: July 16, 2019

Not only was the experience amazing, but our instructor was phenomenal. His professionalism, demeanor with all of us, and thorough preparation of the course was unbelievable.

Great place for the whole family to enjoy!!
Nickname: Alice
Review Date: March 31, 2019

Employees do a great job! Very well organized. Thanks to our flight instructor Sam! She did a great job!

Fabulous first flight!
Nickname: Teamplayer
Review Date: February 3, 2019

The staff was amazing! They were friendly, helpful, and took the time to make sure everyone had a great experience. Young or old...they provide a fun experience!

Best Tunnel to Date!
Nickname: RustyFlyer
Review Date: January 11, 2019

Love the newer recirculating tunnel.
Been a while since I've been in one.
7 years, in fact. Good to get back.
Great for first time fliers. But also for people training .
Alex is a great coach. Ask for him.

iFLY!
Nickname: bacard100
Review Date: January 7, 2019

Wow, iFLY!

Tunnel And Slot Preparation Software

Perfect Safe Adventure For Whole Family
Nickname: IndependentMNMama
Review Date: December 30, 2017

We did this Dec.29, 2017 Georgetown, TX as 3 adults 2 kids ages 10 and 6 for 3mins per person Unbelievable! Absolutely safe, professionally run, considerate and efficient timing, cleanly kept and straight forward no gimmicks! Defintely pay extra to do the high flight! If you freak out and don’t want to do it they refund you. Instructors extremely experienced, friendly and did daring demos. We hung out and watched other groups before-after our time slot. Kids loved it! photographs and video taken super easy to download after and we were also encouraged to take our own. Great fun for all ages! We already have planned to go again. Just do it! Instructor told us that iFly converts into actually skydiving skills for a lot less expensive.

Tunnel And Slot Preparation Machine

Subscribe Today!

Sign up now to be notified of any updates, events, deals for this tunnel.

Map for iFLY Minneapolis


Tunnel And Slot Preparation Tool

Select Your Party Size
(Number of Flyers):


7 or More: